The intercommunity work-camp, which tock place from 30.09. to 02.10, inspired around 30 nature lovers from Belgium and Luxembourg. The scrub clearing and evacuation measures¬†were done in the Junglinster area. The surface of “Scheddelbierg” was prepared in advance in order to be able to work as effective as possible. Overall a surface of about 330 a has been cleared from sloes and mowed grass has been gathered. The workcamp can be considered as a complete success, as the selected area all scheduled works could be finished. Also the following walking-tour was very well received by¬†the participants. During th e weekend many experiences could be exchanged and new ideas could be collected.